- Clean out all product from behind cash wrap.
- Sweep around the cash wrap, colorox phones and keyboards, and collect trash.
- Check the customer holds and run the old holds.
- Run the damages & dime outs into the stockroom (underneath the desk).
- Seperate department runs. Run ALL WACC. Make sure to check the fitting room for WACC runs!
- Close out all WACC on the floor. Pay close attention to the WACC cluster, the WACC wall up front, all the A-Frames, the shoe lounge, the back of zone 2, the belt wall, and the scarves and handbags, seeing as how they are displayed everywhere.
- Make sure every form has a pair of shoes. If not, find them a pair.
- Check hanger bars & bags.
- Check EAS and make sure it was completed for that day. (this is a newer one)
- Help out with womens/mens!
Sunday, April 1, 2012
Closing Checklist
Subscribe to:
Post Comments (Atom)
Nice!!!
ReplyDeleteThanks Charley!
ReplyDelete